3401 Highway 55, Eagan, MN 55121 Mon–Fri 7am–4pm ★ 4.2 on Google · 31 reviews
ProScapes
ASCA accreditedSIMA memberEquipment staged on every routeSalt logged by weightPhoto proof every event
Distribution & logistics

On a distribution site, snow is a throughput problem.

When a driver cannot get through the gate or back square into a door, the truck waits, the dock crew waits, and the appointment schedule slides for the rest of the day. That hour costs more than the snow contract does.

Most snow bids for distribution property are priced like a big parking lot: acreage, a trigger depth, and a promise to be done by 7 AM. A truck court does not work that way. It runs around the clock, it is never empty, and the surfaces that matter most, the gates, truck routes, and dock aprons, are the ones a parking-lot contractor gets to last.

We build distribution routes around how freight moves. Gates and truck routes stay open during the storm, dock aprons are cleared to pavement and deiced, the drop yard is cleared with your yard team rather than around it, and employee lots are timed to your shift changes.

Industrial property is a big part of what we already do, including a distribution warehouse, industrial plants and terminals, and manufacturing and supply yards across the south and east metro.

Request a Winter Site Walk

Walked by the account manager who would run your site. We map the truck routes, docks, and stacking areas with you before we price it.

No obligation Reply within 1 business day
Clearing sequence

The order we clear a distribution site.

Set per site during the walk and written into the contract. On most yards it looks like this, with the first three on continuous service while snow is falling.

Gates and the guard shack

Inbound and outbound gates, the check-in lane, and the approach from the public road, including the windrow the city or county plow leaves across your entrance.

Truck routes and fire lanes

The loop a tractor-trailer actually drives, cleared to full width so drivers are not threading between banks, plus fire lanes and hydrants kept open to code.

Dock aprons and active doors

Aprons cleared to pavement in front of the doors in use, with enough depth for a trailer to back square. Then deiced, because a sloped, iced apron at a dock plate is where people get hurt.

Trailer staging and drop lots

Cleared in coordination with your yard team, row by row as yard trucks pull trailers, so we are not plowing around 53-foot obstacles or burying landing gear.

Employee parking and walkways

Timed to your shift changes, not a 7 AM office schedule. Pedestrian crossings of truck routes get zero-tolerance treatment.

Overflow, perimeter, and stacking

The areas nobody uses in winter, and the place the season's snow is going to live, cleaned up once the operating surfaces are open.

Loader clearing a large commercial lot after a snowfall
What makes it different

Four problems a parking-lot contract does not plan for.

Trailers that never move at once

A drop yard is never empty. We clear in passes that follow your yard moves, and we leave room to come back for the rows you free up during the day.

Three shift changes, not one

Distribution sites start at 5 or 6 AM, turn over mid-afternoon, and again at night. Lots and walks are timed to each change, with walk crews on continuous service during long storms.

Snow that has nowhere to go

A truck court loses trailer positions fast once piles creep inward. We draw a stacking plan before the first snowfall and set a hauling trigger tied to lost trailer positions, not to inches.

Contractor rules on your site

Check-in, PPE, escort requirements, speed limits, and no-go zones. Our crews follow your site rules, our safety program is written down, and certificates of insurance go out the same business day.

Equipment

Sized to a truck court, staged on the route.

Pickup plows on a twelve-acre yard is how sites end up half-cleared at noon. Distribution routes get equipment that matches the job.

  • Wheel loaders with pushers for truck courts and drop yards
  • Plow trucks for drive aisles, gates, and approaches
  • Skid steers for dock wells, around doors, and tight corners
  • Walk crews for employee entrances and pedestrian crossings
  • Calibrated salt and brine trucks, with every application logged by weight
  • Equipment staged along the route before forecast events, and on large sites, on the site itself
Documentation

A record for every pass.

An event report inside 24 hours: timestamps for each pass by area, photos of cleared docks and walks, and product applied by weight. It is what your safety team and your carrier ask for after someone slips at a dock plate.

Service level matrix

What happens at each trigger depth.

Our standard commercial matrix. On distribution sites, gates, truck routes, and docks usually move to continuous service from the first inch.

Sample ProScapes service level matrix
TriggerWhat we doTarget windowDocumentation
Trace – 0.9"Walk and entry inspection; deice as conditions requireBefore tenant arrivalInspection note + photos
1.0" – 2.9"Full lot plow, walks cleared, entries and ADA routes deicedComplete before opening hourEvent report + photos + salt weight
3.0" – 5.9"Continuous service during event; walks cleared on cycle; open-lot passesCycle service, final pass before openingEvent report + per-pass timestamps
6.0"+Dedicated crew assigned for duration; staged equipment; stacking plan executedContinuous until event endsFull event narrative + photo set
Freezing rain / icePre-treat where forecast supports it; repeat deicing passes on cyclePre-treat before onset, then by cycleApplication log with product + weight
Refreeze / melt-cycleDaytime inspection pass; spot deice at drains, downspouts, and shaded walksSame-day inspectionInspection note + photos

Representative matrix. Trigger depths and windows are set per property during the site walk — a hospital entrance and a warehouse back lot do not get the same numbers.

Where we work

Distribution and industrial areas we cover.

Every one of these is on one of our routes. Each city page lists the local snow rules your site has to meet.

  • Eagan — North-end distribution near I-494, I-35E, and Highway 55, anchored by the UPS hub
  • Lakeville — Airlake Industrial Park and Interstate South Logistics Park on 217th Street
  • Shakopee — The Amazon fulfillment center, Valley Park Business Center, and River Valley Business Park
  • Rosemount — The Home Depot and FedEx distribution centers off Highways 3 and 52
  • Savage — The Highway 13 corridor and the Minnesota River terminals
  • Newport — Cold storage and truck terminals along Maxwell and Hastings Avenues
  • Inver Grove Heights — Inverpoint Business Park and the Briggs Drive industrial area
  • Farmington — Trucking terminals and manufacturers along the Highway 3 freight corridor
  • Burnsville — Industrial and distribution along Highway 13 and the west side
  • Eden Prairie — The Golden Triangle and Flying Cloud Business Center
Questions

What distribution and facility managers ask.

Can you plow a yard full of parked trailers?
Yes, but not all at once and not by plowing around them blind. We clear the drive aisles first, then work row by row with your yard team as trailers are pulled, and come back for the rows that open up during the day. Snow left against landing gear and between trailers is what freezes into the ruts that stop yard trucks in February.
What trigger depth do you use on truck routes?
Usually lower than the rest of the site. Truck routes, gates, and dock aprons are commonly set at 1 inch or on continuous service during an active storm, while overflow and perimeter areas wait for the end of the event. The exact numbers are set per site during the walk and written into the contract.
Seasonal or per-event pricing for a 24/7 facility?
Most 24/7 distribution sites choose seasonal pricing, because continuous service during long storms makes per-event invoices hard to predict. We price both so you can compare them against recent Twin Cities winters.
Do you deice dock aprons?
Yes. Aprons and dock approaches are pre-treated ahead of forecast events where it helps and deiced after every clearing pass, with every application logged by weight. Sloped aprons get return passes when meltwater refreezes overnight.
Can you haul snow off site?
Yes. When the stacking plan runs out of room we load and haul, usually overnight or between shifts. The hauling trigger goes into the contract before the season, so it is a planned cost rather than a surprise.
Can your crews work under our site safety program?
Yes. We maintain industrial plants, terminals, and warehouse property today and are used to site orientations, check-in procedures, PPE, and escort rules. We provide our written safety program and certificates of insurance for your contractor approval process.

Walk the yard with us before the next storm.

Bring your shift schedule and your yard map. You will get a clearing sequence, a stacking plan, and a price, in writing.

Call (651) 528-8700 Request a Site Walk