3401 Highway 55, Eagan, MN 55121 Mon–Fri 7am–4pm ★ 4.2 on Google · 31 reviews
ProScapes
ASCA accreditedSIMA memberEquipment staged on every routeSalt logged by weightPhoto proof every event
Minneapolis commercial properties

What winter looks like in Minneapolis, and how we run it.

Minneapolis is a different job than the suburbs: tighter lots, alleys, a three-day snow emergency that moves parked cars around your building, and the strictest commercial sidewalk rule of any city we serve.

Commercial property runs from downtown and its skyway system to the North Loop, Northeast, Uptown, and the Lake Street corridor, with mixed-use and multifamily buildings everywhere in between. Most of it has little room to stack snow, so by mid-winter many lots depend on hauling. We serve Minneapolis from Eagan, about twenty minutes by Highway 55 or I-35W.

About 20 minutes from our Eagan yard and salt storage. Minneapolis runs on its own north route, with walks on the first pass so the four-hour clock is met.

Request a Winter Site Walk in Minneapolis

Walked by the account manager who would run your property. Scoped, documented proposal before your renewal date.

No obligation Reply within 1 business day
Minneapolis snow rules

What the City of Minneapolis requires of commercial properties.

From the city's own code and public works pages. Rules change, so each one links to its source.

Sidewalk deadline

Commercial, apartment, and all properties other than single-family homes and duplexes must clear walks within four daytime hours (8 AM–5 PM) after snow stops. The city inspects, clears uncleared walks, and bills the owner, and unpaid bills go on the property taxes (Ord. 445.20).

Source

Snow on the street

It is against the law to shovel or plow snow into streets or alleys.

Source

Snow emergencies

Day 1 at 9 PM: no parking on snow emergency routes. Day 2 at 8 AM: no parking on the even side of other streets. Day 3 at 8 AM: no parking on the odd side.

Source
What it means for your contract: Four daytime hours is tight. A storm that ends at 4 AM means walks must be done by noon, so walks go on the first pass, not after the lot.
Where we work

Minneapolis's commercial areas.

  • Downtown and the skyway
  • North Loop
  • Northeast
  • Lake Street corridor
  • Uptown
Built for Minneapolis

Three things we plan for here.

The four-hour sidewalk rule

Walks on the first pass and timestamped, so the city's commercial window is met and documented.

Tight lots and hauling

Stacking plans for lots with nowhere to push, and a hauling trigger tied to usable stalls, not to a snowfall total.

Mixed-use and multifamily

Entries, garages, trash enclosures, and alleys scoped by building, with snow emergency days built into the schedule.

Service level matrix

What happens at each trigger depth.

Tuned to each Minneapolis property during the site walk and written into your agreement. “As conditions warrant” is not a scope.

Sample ProScapes service level matrix
TriggerWhat we doTarget windowDocumentation
Trace – 0.9"Walk and entry inspection; deice as conditions requireBefore tenant arrivalInspection note + photos
1.0" – 2.9"Full lot plow, walks cleared, entries and ADA routes deicedComplete before opening hourEvent report + photos + salt weight
3.0" – 5.9"Continuous service during event; walks cleared on cycle; open-lot passesCycle service, final pass before openingEvent report + per-pass timestamps
6.0"+Dedicated crew assigned for duration; staged equipment; stacking plan executedContinuous until event endsFull event narrative + photo set
Freezing rain / icePre-treat where forecast supports it; repeat deicing passes on cyclePre-treat before onset, then by cycleApplication log with product + weight
Refreeze / melt-cycleDaytime inspection pass; spot deice at drains, downspouts, and shaded walksSame-day inspectionInspection note + photos

Representative matrix. Trigger depths and windows are set per property during the site walk — a hospital entrance and a warehouse back lot do not get the same numbers.

Lots, drive and fire lanes, walks, entries, ADA routes, docks, stairs, stacking, hauling, and refreeze inspection, with salt logged by weight. Full snow & ice program.

Property types in Minneapolis

Scoped by property type, not by square foot alone.

Property Management

One account manager and one event report across the portfolio.

How we scope it

Retail & Mixed-Use

Pre-opening clears and storefront-safe deicing.

How we scope it

Medical & Senior Living

Lower triggers, ER-priority routes, melt-cycle inspections.

How we scope it

Office Parks & Class A

Cleared before the 7 AM arrival, every event.

How we scope it
Questions

What Minneapolis property managers ask.

What is the Minneapolis sidewalk snow rule for commercial property?
Commercial, apartment, and all properties other than single-family homes and duplexes must clear sidewalks within four daytime hours (8 AM to 5 PM) after snow stops. Single-family homes and duplexes get 24 hours. The city can clear uncleared walks and bill the owner. Source: City of Minneapolis sidewalk snow clearing.
Do you haul snow off site in Minneapolis?
Yes. Many Minneapolis lots have no room left to stack by mid-January. We map the stacking plan before the season and tie the hauling trigger to a minimum number of usable stalls rather than to a snowfall total.
How do snow emergencies affect our property?
Parked cars move from side to side over three days, and plows windrow the curb at your entrances each time. We schedule entrance and curb-cut cleanups to follow the city's day 1, 2, and 3 plow passes.
What is your trigger depth, and can we change it?
Our default commercial trigger is 1 inch for full-lot service, with walks and entries inspected at any measurable accumulation. Trigger depth is set per property during the site walk and written into the contract.
Do you price seasonally or per event?
Both. Seasonal pricing gives you a fixed winter line and shifts the weather risk to us; per-event costs less in a light winter and more in a heavy one. We price both so you can see the spread against recent Twin Cities seasons.
We manage this property from out of state. How does that work?
Most of our portfolio clients are not on site. You get one account manager, certificates of insurance the same business day, and an event report inside 24 hours with timestamps, photos, and salt by weight — so you can see the lot was clear at 6 AM without calling anyone.

Get a winter site walk in Minneapolis before the routes fill.

Walk the property with us now and you will have a scoped, documented proposal in hand before your renewal date.

Call (651) 528-8700 Request a Site Walk