Retaining wall and patio permits in the south metro, city by city

The four-foot rule is state code and applies everywhere. What each city adds on top of it is where projects get stopped: zoning permits for short walls, building permits for patios, hard-surface limits, and easements.

The short version

  • Statewide, a retaining wall over four feet, measured from the bottom of the footing to the top of the wall, needs a building permit. So does a shorter wall that supports a surcharge.
  • The measurement includes the buried part, so a wall that shows three and a half feet can be over the line.
  • Eagan requires a free zoning permit even for walls under four feet and for patios. Rosemount requires a building permit for patios, pavers included.
  • No city here allows walls or patios in drainage and utility easements without approval.
  • Hard-surface limits range from 25% to 50% of the lot, depending on the city, lot size, and distance to water.

The statewide rule

Minnesota's building code exempts from a building permit "retaining walls that are not over four feet (1,219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge." Every city in the state starts from that sentence. Three parts of it matter in practice:

  • Measured from the bottom of the footing. The buried course and the base count. A wall with three and a half feet showing above the ground can measure more than four feet by this rule.
  • Unless supporting a surcharge. A surcharge is extra load on the soil behind the wall: a driveway, a patio, a building, a steep slope, or another wall. A two-foot wall holding up a driveway can need a permit and engineering.
  • Tiered walls. Eagan and Inver Grove Heights both state that terraced walls set closer together than twice the height of the lower wall are treated as a single wall. Two three-foot walls four feet apart are a six-foot wall to the city.

The exemption is from a building permit only. Cities can and do require zoning permits, grading permits, and setbacks for walls of any height.

What each city requires

Read from each city's permit pages and code in November 2026. Follow the city link for the source and the details.

CityRetaining wallsPatiosHard-surface limit
EaganBuilding permit over 4 ft or with a surcharge. Free zoning permit under 4 ft.Free zoning permit for patios, walks, and sport courts.25% in the Shoreland Overlay.
Apple ValleyBuilding permit over 4 ft or with a surcharge, with plans signed by a licensed engineer. A natural resources permit may also apply at 4 ft and up.Counts toward the hard-surface limit. A natural resources permit applies if the work moves more than 20 cubic yards or disturbs 3,500 sq ft.35% to 50%, by lot size. 35% on lots of 10,000 sq ft or more.
BurnsvillePermit at 4 ft or taller, measured from the footing.Counts toward the hard-surface limit near lakes. Pavers and gravel count.25% within 1,000 ft of a lake.
LakevilleBuilding permit over 4 ft or with a surcharge.Not allowed in pond or drainage easements. Nothing but grass and ground cover in the boulevard.25% in shoreland areas.
RosemountBuilding permit at 4 ft or taller. Engineering required unless built to an engineered product's instructions.Building permit required, pavers included. 5 ft from side and rear lot lines, 15 ft from the front.Ask the city for your zoning district.
Inver Grove HeightsBuilding permit over 4 ft or with a surcharge, with plans by a Minnesota licensed structural engineer.Counts toward the hard-surface limit.About 25% to 40%, by lot size. Confirm with Planning.
Mendota HeightsBuilding permit over 4 ft. The zoning code also regulates walls on single-family lots, so check before building one of any height.Stormwater permit if the project disturbs more than 5,000 sq ft or moves 50 cubic yards.A limit applies and pavers count. Confirm the percentage with the city.
SavageBuilding permit over 4 ft, with a survey showing wall elevations. Boulder walls over 4 ft need a licensed engineer's approval.Not allowed in utility or drainage easements, along with fire pits and stairs.35%. 25% within 1,000 ft of a lake or 300 ft of a river or creek.

Where a cell says to ask the city, it is because we could not confirm the figure on the city's own pages. We check it for your lot before the design is final.

Easements and the boulevard

More projects are stopped by easements than by wall height. A drainage and utility easement is a strip of your lot, usually along the lot lines and around any pond, that the city or a utility has the right to use. You own it and mow it, but you generally cannot build in it.

  • Rosemount describes typical easements as 10 feet along front and back lot lines and 5 feet along the sides, and says trees, walls, patios, and fire pits placed in them are removed at the owner's expense.
  • Savage does not permit retaining walls, paver patios, stairs, or fire pits in utility or drainage easements.
  • Eagan and Inver Grove Heights do not allow a wall of any height in an easement without approval from city Engineering.
  • Lakeville allows only grass, ground cover, and mailboxes in the boulevard, which is usually the first 14 feet behind the curb. Boulders, shrubs, and landscape rock are prohibited there.

Your property survey shows the easements. If you do not have one, the city or county often has the plat on file. We ask for the survey at the first meeting for this reason.

Hard-surface limits

Cities limit how much of a lot can be covered by surfaces that shed water. The house, garage, driveway, walks, and patio all count, and so do pavers and compacted gravel in the cities that spell it out. The limit is tighter near water: 25% of the lot in Eagan's Shoreland Overlay, within 1,000 feet of a lake in Burnsville, and in the shoreland areas of Lakeville and Savage.

Before you size a patio, add up what is already there. On a 10,000 square foot Apple Valley lot the limit is 35%, or 3,500 square feet. A 2,000 square foot house footprint with an 800 square foot driveway and 200 square feet of walks leaves 500 square feet for a patio.

When moving soil needs its own permit

  • Apple Valley: a Natural Resources Management Permit when a project moves more than 20 cubic yards, disturbs 3,500 square feet or more, or changes drainage. Applications go in 15 days ahead.
  • Rosemount: a grading permit at 50 cubic yards or more.
  • Mendota Heights: a Stormwater Management Permit when more than 5,000 square feet is disturbed or 50 cubic yards is moved.
  • Inver Grove Heights: in shoreland impact zones, a land alteration permit starts at 50 cubic yards, or 10 on steep slopes.

Twenty cubic yards is about two dump-truck loads. A patio cut into a slope with a wall behind it reaches that quickly.

Before anyone digs

  1. Find your survey and mark the lot lines and easements.
  2. Call 811. Minnesota law requires notifying Gopher State One Call before excavating, at least two business days ahead. It is free. It marks public utilities only, so private lines such as irrigation, invisible fence, and gas lines to a grill are yours to point out.
  3. Check your HOA documents if you have an association. Their approval is separate from the city's.
  4. Ask who pulls the permit. It should be the contractor, and the permit and inspection should be lines on the proposal.

We prepare and file the permits as part of every wall and patio project.

Common questions

How tall can a retaining wall be without a permit in Minnesota?
Under the state building code, a wall up to four feet tall, measured from the bottom of the footing to the top of the wall, does not need a building permit unless it supports a surcharge. Cities can still require a zoning permit: Eagan does, at no fee, for walls under four feet.
Do I need a permit for a paver patio?
It depends on the city. Rosemount requires a building permit for patios, including pavers. Eagan requires a free zoning permit. In other cities a patio may not need its own permit but still has to stay out of easements and within the hard-surface limit.
Do two short walls avoid the four-foot rule?
Only if they are far enough apart. Eagan and Inver Grove Heights treat tiered walls closer together than twice the height of the lower wall as one wall.
Who is responsible if a wall is built without a permit?
The property owner. A city can require an engineer's review after the fact or removal of the wall, and unpermitted work can come up when the house is sold.
About this guide. Written from how we plan and price work at ProScapes, a family-owned landscape and snow company based in Eagan since 1958. Rules and programs were checked against the sources below in November 2026. They change, so confirm anything that matters to your project with the city or agency named.

Let’s walk the space.

Consultations are free and unhurried. Bring photos or just the problem you keep looking at, and we will tell you honestly what it takes to fix.

Call (651) 528-8700 Free Consultation